Unit II is situated at Pashamylaram and is about 45 kilometers from Hyderabad airport. The facilities are built over a total area of 36,800m2 and consist of three main production blocks, an engineering workshop and four warehouses.
![Highlights](/sites/neulandlabs/files/neuland-labs/about-us/our-facilities/Unit-II.webp)
Highlights
- Total reactor volume: 380 kL
- Blocks: 3 Production blocks, FC, NMSM, Mini plant(A&B))
- Hydrogenation reaction volume: 6 kL
- Solvent recovery system: 20 kL/d
- Cryogenic reaction volume: 15 kL
Reactions handled
- Stereo-specific synthesis
- Micheal Addition Reaction
- Silylation Reaction
- Enzymatic Reaction
- Cyanation
- Phosgenation
- Reduction
- Halogenation
- Condensation
- Sodamide Reaction
- Sodium Hydride Reaction
- Esterification