Overview
Neuland acquired a manufacturing facility (intermediate/API), Unit III, at Gaddapotharam industrial area near Hyderabad in December 2017. The facility is spread across approx. 12 acres and was inspected by the USFDA in 2015.
This manufacturing site is a multi-product facility and has five production blocks for advance intermediate and API manufacturing. It also has capabilities for on-site development, analytical method development, quality control laboratory and a pilot plant. Unit III was acquired and is designed to offer the much-needed flexibility to Neuland’s operations in the near term and more importantly to meet the growth aspirations of the company.
Highlights of Unit III
Services
Capabilities
Block | Capabilities |
Block – I | Two Production Lines with Pharma Area |
Block – II | Intermediates Block |
Block – III | Pilot Plant |
Block – IV | Equipment for handling Sodium Cyanide Reactions
Handles enzymes for Biocatalytic Reactions Fitted with PH Stats and Dosing Equipment |
Block – V | Large block with RCVD – currently on intermediate
Civil structure for large pharma area |
Block – VI | Large civil structure |
Utility Services at Unit III